Saturday, November 28, 2015

27 NOV 15: Section 37, fuel system, page 39-3 steps 2-5: 5 hours
Flew up to Atlanta to spend Thanksgiving with my Dad and his wife.  Upon returning, I had my new tubing bender – works much better than the cheapo I purchased from Cleaveland:
Reworked the hard line from the filter to the pump:
Finished up by completing the F-1089 elevator pushrod:

28 NOV 15: Section 37, fuel system, page 39-4 steps 2-5: 6.5 hours
Reworked the hard line from the pump to the transducer:
Went through and torqued all the fittings using a crow’s foot.  Surprisingly, I was able to reach them all with the torque wrench.  Finished the session by making the F-1090 elevator pushrod.  Riveting the VA-101 threaded rod end:
Both pushrods complete: