Wednesday, May 28, 2014

27 MAY 14: Page 10-13 steps 1-7: 2.5 hours
Made the F-1011D horizontal stabilizer attachment bar support angle and the F-1012D up elevator stop:

Match-drilled the four holes of the aft deck into the F-1010B spacer and the F-1010A horizontal attachment angle.  Match-drilled all the side holes of the F-1014 aft deck into the F-1032 longerons:

Match-drilled the holes of the support angle into the F-1014 aft deck, the stop/doubler, and the F-1032 longerons:
Match-drilled the holes of the elevator stop into the aft deck and F-1032 longerons:
28 MAY 14: Page 10-14 steps 1-5, page 10-15 steps 1-2: 2.75 hours

Removed the F-1074/75 top skins and the F-1047 stiffeners.  Drilled the F-636 shoulder harness anchors.  Drilled the static source holes in both the F-1073L/R skins.  Final drilled the four attachment holes and nut plate attachment rivet holes in the F-1073 side skins for the cover plates.  Disassembled the tailcone. No pics.

No comments:

Post a Comment