31 MAR / 6 APR 15:
Deburring: 6.5 hours
More deburring of fuselage spar parts - no pics.
7-8 APR 15: Prekote: 3.75 hours
9 APR 15: Priming: 2.5
hours
Got all the parts primed. Started
with shooting the exterior of the elevators.
I wasn’t priming the external surfaces when I put together the
empennage, so little by little I’ve been shooting the empennage parts. Elevators drying:
I always
lose a bit of motivation with each new section.
There is a lot of monotony at first – nothing but deburring. Glad to have the priming done – means more
building is right around the corner.
Spar parts:
More
parts:
10 APR 15: Page 25-4
steps 1-5: 2.7 hours
Riveted the mid seat rail support subassemblies together:
Riveted
the nutplates onto the upper flanges of the mid seat rail support
subassemblies:
11 APR 15: Page 25-4
steps 6-7, pg 25-5 steps 9-11, pg 25-6 steps 1-7: 7 hours
Finally felt back into the swing of things today – made a lot of progress
on the spars. Riveted the mid
seat rail support subassemblies to the forward center section bulkhead assembly. Front:
Aft:
Riveted the
F-1004J center section upright bars to the aft center section bulkhead
assembly. Longest rivets so far – AD 4-16!
Finished
up both bulkhead assemblies. Forward
assembly:
Aft assembly: