Haven't done a lot of work on the fuselage lately - busy at work. What progress has been made isn't very picture worthy! A lot of match-drilling and deburring.
11 MAR 15: Page 25-2
steps 7-9, pg 25-3 steps 1-7: 4 hours
Match-drilled forward center section bulkhead assembly – no pics.
12 MAR 15: Page 25-3
step 8: 1.25 hours
Match-drilled and deburred forward center section bulkhead assembly – no pics.
13 MAR 15: Page 25-5
steps 1-2: 1 hour
Final-drilled
aft seat rail support subassemblies – no pics.
17 MAR 15: Page 25-5
step 4: 1 hour
Match-drilled and deburred aft center section bulkhead assembly. Cut the F-1004L hat stiffeners. Rough cut:
19 MAR 15: Page 25-5
steps 4-6: 1 hour
Match-drilled and deburred aft center section bulkhead assembly – no pics.
21 MAR 15: Page 25-5
steps 7-8, pg 25-6 steps 5-6: 1.25 hours
Match-drilled and deburred aft center section bulkhead assembly. Fabricated and match-drilled the F-1004M wear
strip – no pics.
22 MAR 15: Page 25-7
steps 1-3, pg 25-8 steps 1-4: 3 hour
Match-drilled rear spar bulkhead assembly. A bunch of deburring ahead!
27/29 MAR 15: Deburring:
3 hours
Not
a lot to show lately. Just a lot of
deburring fuselage spar parts.