12 APR 15: Page 25-7
steps 4-7, pg 25-8 steps 6-7, pg 26-2 steps 1-4: 4.25 hours
Riveted
the nutplates onto the F-1005C-L/R bulkhead side channels and F-1063B-L/R idler
arm brackets:
Riveted
the F-1005B rear spar attach bars to the
rear spar bulkhead. Held the workpiece in
the table vice, which allowed me to use the vice to level the bucking bar:
Made for
fast work of the riveting and gave nice consistent results – just like
squeezing:
Riveted
the F-1005E-L/R gussets to the F-005C-L/R bulkhead side channels:
Bulkhead
complete:
Based on
reading Tim Olson’s site, I decided to rivet the two nutplates on the top
flange of the F-1034A bulkhead. This isn’t
called for at this point, but it was recommended to do it now when access is
easy. Looking ahead in the plans, I
couldn’t see a reason why it could not be done now – hopefully it doesn’t cause
any issues in upcoming construction:
I’m glad
to make progress, but it all went together too fast – no parts left in this
section. Tons of time to prep all the
parts, but hardly any time to put together – all these pieces are open with
easy access for shooting rivets, so quick work getting through this
section. All the bulkheads ready to go:
Back to
the monotony of drilling, deburring, and primer prep. All the parts for the next section:
No comments:
Post a Comment