Sunday, January 15, 2017

4-5 JAN 17: Page 45-5 steps 11-12 (L): 7.75 hours
Trimmed the outside perimeter of the left door.  The plans have you keep the index tabs on the doors while trimming to fit, but like others before me, I chose to make my own index tabs, so the doors can sit in their final position while trimming.  Marked and cutout the tabs from some scrap:

The tabs did a good job of holding the door in position:

I lost count with how many times I had the door on and off.  Off, trim, on, mark, off, trim, on, mark, off…again and again and again!  Not going for perfection at this point as the door will certainly shift a bit as I add the hinges, install the door seal, etc.  Looking pretty good:

11-12 JAN 17: Page 45-6 steps 1-3 (L), page 45-7 1-3 (L): 6 hours
Cut the threads off of four AN3-21A bolts to make the pins for the door hinges.  I had read other build logs that mentioned the play in the hinges.  One of the logs suggested shifting the forward hinge all the way forward and the aft hinge all the way aft while drilling the hinges.  In this way, the slop in the hinges is removed.  I made a couple of shims to hold the hinge in position as I drilled:

These held the hinges very well while drilling to the doors and removed any and all slop from the hinge:

Left door attached to the cabin top:

Inside of the hinges:

14 JAN 17: Trimmed left door gutter and fit door seal: 5.5 hours
Trimmed and sanded the door channel to fit the McMaster Carr seal.  My garage will never be the same – fiberglass dust everywhere! Forward edge:

Aft edge:

Still have some work to do on it.  I have the lateral distance trimmed well – looks consistent the entire way around the door opening.  However, I still have to adjust the width of the gutter to get a consistent 1/4 inch gap the entire way around – have some tight spots at the moment.  More sanding!!

Tuesday, January 3, 2017

10 DEC 16: Page 45-4 steps 6-7: 1.5 hours
Match drilled #30 and clecod the gas strut doubler to the inner shell.  Epoxied the strut doublers to the inner door shells.  Re-drilled #30 and riveted the doublers to the door shells:

 1 JAN 17: Page 45-5 steps 1-7 (L), page 45-4 steps 1-5 (R): 4.5 hours
Masked to fuselage with a piece of drop cloth in preparation of joining the outer and inner door shells:

I also chose to use some leftover insulation to insulate the doors.  I did this only to add some mass as the doors appear really flimsy.  Not sure if this was worth the effort, or will help in any way…

Epoxied the two shells together and placed the door subassembly onto the fuselage to cure.  Like many before me, I chose to cleco the door all the way around the door frame, rather than using clamps and weights as the plans suggest:


Finished this work session by attaching and match-drilling the right door subassembly to the fuselage.  This door is now ready for sanding and bonding:

Sunday, December 4, 2016

28 NOV 16: Page 43-9 step 1: 1.5 hours
Cut and fit the C-1004-L/R windows:

1/2 DEC 16: Page 43-8 step 4-8, fit overhead console, 43-9 step 1, 45-08 steps 1-2 : 8.25 hours
Match-drilled #12 the WD-1043 center cabin brace to the F-1044A forward cabin rib and the F-1044B angle.  Trimmed and fit the C-1005 windscreen:

Trimmed and fit overhead console:

Finished trimming side/rear windows.  I’m not sure what is worse plexi or fiberglass dust!

3 DEC 16: Page 45-2 steps 3-4 (L), page 45-4 steps 1-5 (L): 5 hours
Sanded the inside mating surfaces of the C-1002A/B-L cabin door shells:

Match-drilled and clecoed the C-1002A/B-L cabin door to the cabin cover.  The  plans have you tape the door to the cabin top, but like those who have done this before me, I chose to drill into the top and secure with clecos all the way around to get a better fit for final epoxying of the inner/outer door shells:

Sunday, November 27, 2016

Well, so much for keeping my blog up to date - 90 days since the last update!!  Not a whole lot of work over the past several months, but below is what has happened.  I'd like to say I will be making more regular updates, but I'm in for another build/blog delay - just like last year.  I'll explain in a separate post.

28 AUG 16: Page 43-5 step 1, fiberglass practice: 6.5 hours
No pics

29 AUG 16: Page 43-5 steps 1-4, page 41-7 steps 2-4: 5.5 hours
No pics

30 AUG 16: Page 43-5 steps 4-5, page 43-6 steps 1-4, page 43-7 steps 1-7: 4.5 hours
No pics

31 AUG 16: Page 43-7 step 8: 1 hour
No pics

7 SEP 16: Page 43-7 step 8, page 43-8 steps 1-3, tailcone VHF doubler: 3.25hours
Countersunk all the #12 and #19 holes in the cabin top:

Made a doubler for the #2 VHF comm antenna that I will be putting on the tail cone just aft of the cabin top:

11 SEP 16: VHF doubler: 3.5hours
Finished the antenna for the #2 comm antenna.  Doubler riveted to the top skin:

Antenna as it will be placed once final installed:

19 SEP 16: Page 41-7 step 1, page 45-2 step 1: 3.5hours
Fabricated the cowl attach shims.  Marked the outside perimeter and window flanges of the C-1002A-L/R cabin door outer shells in preparation for trimming.  I’ve had this tool since I started building and never got to use it…until now…  Did a good job for this purpose:

26 SEP 16: Page 45-2 step 1: 2.5 hours
Trimmed the outside perimeter and window flange of the C-1002A-L/R cabin door outer shells.  Fiberglass fun!

27 SEP 16: Page 45-2 steps 1-2, page 43-3 steps 2-4: 4.5 hours
Finished trimming the outside perimeter and window flanges of the C-1002A-L/R outer shells and the C-1002B-L/R inner shells.  Trimmed and sanded the canopy top – so much fiberglass fun!

12 OCT 16: Redo upper fuse, page 31-2 steps 4-5, page 31-3 1-3, page 31-4 1-2: 3.5 hours
I was never happy with the quality of my upper fuse – the only metal work in the entire plane that had a few blemishes.  I decided that I didn’t want to spent (hopefully) the rest of my life walking to my plane and seeing the blemishes, so I decided to replace this:

With this:

16 OCT 16: Page 31-2 step 3, debur, page 31-4 step 4: 3 hours
Fabricated the F-1003D/E panel attach flanges, deburred all the panel pieces, clecoed the panel structure together:

17 OCT 16: Tested repaired tank: 2.5 hours
I think I’ve probably had the tank off for a year now – very glad to get the repair behind me.  Did the balloon check and also sprayed the tank thoroughly with a leak detector - basically fancy soapy water.  I’ll take the tank back out to the hangar (where the wings are being stored and wait a bit (cooler weather) before installing the tank back on the spar:

18 OCT 16: Page 31-2 steps 1-2, page 31-5 steps 1-2: 2.5 hours
Fabricated the F-1044C spacer and the F-1044B angle:

7 NOV 16: Replace flanges on upper fuse L/R ribs: 2.25 hours
I had an odd alignment issue with the upper fuse – the left and right rib flanges didn’t line up with the holes in the firewall once everything was riveted together.  A call to Van’s had them scratching their heads – said they saw the same misalignment in pieces in the warehouse.  Their advice was to get some angle and make some new flanges, so that’s what I did:

13 NOV 16: New upper fuse: 1.5 hours
The culprit of the original outies are marked in red in the pic – the corner of the flanges.  I taped a steel ruler along the flanges to see how much shimming will be needed to get a nice curve:

18/19 NOV 16: New upper fuse: 3.75 hours
A bit tedious, but the shimming seems to be doing the job!  Hopefully the marks will not reappear once riveted:

20 NOV 16: Page 31-6 steps 1-4, page 31-7 step 1: 2.5 hours
Match drilling the new upper fuse assembly – no pics.

21 NOV 16: Prekote / prime upper fuse parts: 6 hours
Been quite a while since I messed with the Prekote / Akzo routine.  Guess what?  I didn’t miss it!!  All the new upper fuse parts – next step is to put it together; the fun part!

22 NOV 16: Page 31-3 steps 1-3, page 31-7 steps 1-5, page 31-8 steps 1-6: 5 hours
Putting together all the new upper fuse parts.  New flanges riveted on the L/R ribs:

23 NOV 16: Page 31-8 steps 7-15, page 31-9 steps 1-2: 8.5 hours
Continued riveting the upper fuse structure together.  Center section:

A little awkward to rivet on the bench – hard to keep it from moving – so a stuck a piece of PVC through the ribs and clamped it onto my work bench.  Worked really well – much easier to rivet when the work piece isn’t dancing all over the place.

26 NOV 16: New upper fuse: 1.5 hours
Continued work assembling the upper fuse structure – no pics.

27 NOV 16: Page 31-9 step 3, installed fans in glare shield, put cabin top back on: 12 hours
Marathon day, but got a lot done!  I riveted the upper fuse skin to the sub-structure.   I had a friend help with the last upper fuse, but shot this one by myself.  It was very slow going – lots of awkward angle to shoot and buck, but I got great results.  I then mounted two computer fans into the top skin that will serve to circulate hot air from the avionics bay and will also serve as windshield defrost – the fit was good:

I am so glad I decided to redo the upper fuse.  My results were much better this time – looks great, and now matched the very nice build quality of the rest of the airframe!

Now that the new upper fuse is complete, I can now get back to forward progress – fiberglass work!!  I ended the night by putting the cabin top back on.  Next up will be to trim the windows and window openings, fit the Aerosport overhead console, finish the inside of cabin top, and continue work on the doors:

Saturday, August 27, 2016

27 AUG 16:
Holy cow, what a delay in the build!  I have just started to get back into the project; I’ll begin regular updated and hour totals beginning in September.  Today I accomplished two big tasks that I have been dreading.  First, I completed fitting the canopy.  This took much longer than planned.  I believe I had it on and off a bazillion times and removed a ton of material to get it to fit.  Close, but no cigar.  Remove once again and more sanding!

Finally, it fits!

 Close up of the fit against the upper fuse skin:

Nice to see the plane with the canopy on – if only temporarily!

The second thing I did was to repair my left tank.  I never wrote about it, but a long time ago, when I was transporting the wings to my hangar…get ready for it…one of the wings fell off the wing stand and fell to the trailer floor!  Considering how badly it could have turned out, I got away relatively unscathed – only a dent to the inboard leading edge (tank) which also bend the rib flange and compromised the sealant.  The damage:

Made a small form block and used a c-clamp to apply pressure:

Used a hammer to tap out some of the bends and get it back close to the original shape.  Turned out better than I expected.  Damaged sealant removed, sanded, acetoned, and ready for new Proseal:

Repair complete with new Proseal.  I’ll let the sealant cure for a week or so and then do another pressure test on the tank.  Crossing fingers for no leaks!