31 MAY 15: Dimpling, page 28-11 steps 2-5, page 28-15 steps 5-6:
7.75 hours
Riveted nutplates to the F-1043A-L/R fuselage
bulkheads:
Riveted nutplates to the F-1043B-L/R fuselage
bulkheads. Installed the tunnel access
panel on the right hand forward fuselage rib.
Doubler installed:Cover panel installed:
Now that the access plate is installed, I attached the rib to the firewall. ‘Slight’ back rivet plate misalignment – doh!!!
The good news is that at this point in the build, I have enough experience with replacing rivets that this doesn’t even phase me! Grind off the mangled manufactured head with the dremel:
Drilled out – no fuss no muss:
Good as new – only a 15 minute detour…
Riveted the F-1043-L/R attach angles to the forward
fuselage ribs:
Dimpling my life away – once again…
Riveted the seat rail supports to the forward fuselage bulkheads:
Finished up the evening by riveting together the seat floor assemblies:
No comments:
Post a Comment