17 MAY 15: Page 27-4 steps 7-8: 4.75 hours
Riveted the WD-1004 nose gear tension fittings,
F-1001E-L/R center angles, and nutplates to the F-1048-L/R forward fuselage
ribs. One of the nose gear fittings:
Riveted
the left forward rib subassembly and the F-1001G-L gusset to the firewall
bulkhead subassembly. I will leave the
right rib off for now. I ordered the
tunnel access panel kit and it will be much easier to install with the rib off. The bulkhead is pretty much complete:
No comments:
Post a Comment