28 DEC 14: Page
18-6 steps 1-5: 7 hours
Installed snap bushings into the tank ribs, fabricated the
fuel vent lines – flared the inboard end of the tube:
Installed the AN832-4D bulkhead union and AN924-4D nut on
the T-1003B R/L tank end ribs. Riveted
the T-1003B-R/L tank inboard rib aft assemblies to the T-1001-L/R fuel tank
skins and T-1005-L/R tank attach brackets:29 DEC 14: Proseal, page 22-2 steps 4-5, pg 22-3 steps 1-5: 6.5 hours
Continued prosealing tanks – tired of proseal! Inside of inboard rib:
Outside:
Finished drilling all of the flap rib subassemblies.
30 DEC 14: Page
22-4 steps 1-2: 1.5 hours
Trimmed the tabs off of all FL-1005-:/R main ribs. Clecoed together the left flap structure:
31 DEC 14: Page
22-5 steps 1-2: 1.5 hours
Clecoed the FL-1002/FL-1001C skins and FL-1001A-L/FL-1001B-L
nose skins in place. Clecoed the
FL-1009A/B trailing edges to the top and bottom skins. Final drilled #40 all skin to skeleton
holes. Match-drilled all FL-1007-R hinge
bracket flanges using the holes in the FL-1007-L flanges as a guide:
Disassembled the flap.
A lot of work all goes back to this…
No comments:
Post a Comment