08 DEC 14: Priming
tank parts: 4 hours
Primed the exterior tank skins and a few of the tank
parts. All of the interior tank parts
that will be exposed to fuel will remain unprimed. The shop is getting pretty crowded! I’ll be glad to get the tailcone and wings
into the hangar:
Some of the tank parts:09 DEC 14: Finished priming, page 18-4 step 1, page 18-5 steps 4-5, page 21-02 steps 1-2: 5 hours
Riveted the nutplates to the attach Z brackets:
Riveted the K1100-08 nutplates to the shims:Attached the VA-146 bearings to the tank attach brackets:
Attached the K1000-08 and MS21051-L08 nutplates and T-1005B
and C shims to the tank attach brackets:
I’m done with the tanks until I break out the proseal, so it’s
time to move on to the ailerons.
Separated the A-1006-1 outboard hinge brackets and A-1007-1 inboard
hinge brackets. Fluted and straightened
the flanges of the A-1004-1L and A-1004-1R nose ribs and A-1015-1L and
A-1015-1R inboard nose ribs.
10 DEC 14: Page 21-03
steps 3-5: 2.7 hours
Machine countersunk the holes in the A-1006-1B outboard
hinge brackets and A-1007-1B inboard hinge brackets. Machine countersunk the A-1008-1 doubler –
no pics.
11 DEC 14: Dimpled
tank skin, page 18-4 step 8 left skin: 2.5 hours
Dimpled the left tank skin – no pics
12 DEC 14: Dimpled
tank skin, page 18-4 step 8 right skin, page 18-5 step 8: 2.5 hours
Finished dimpling the tank skins. The right skin:
Riveted two of the T-1011 stiffeners to the T-1001-L tank
skin. The proseal wasn’t too bad once I
got my system down.
13 DEC 14: Page
18-5 step 8: 5 hours
Finished riveting the T-1011 stiffeners and VA-112 drain
flange to the T-1001-L tank skin: