Sunday, May 18, 2014

18 MAY 14: Page 10-9 steps 3-5, page 10-10 steps 1-6: 2 hours
Final drilled the 3/32” nutplate attachment rivet holes in both the F-1037B&C bellcrank rib angles,  countersunk the holes.  Final-drilled holes common to the F-1037 bellcrank angles and F-1029 bellcrank ribs and the four holes of the F-1028 baggage bulkhead channel.  Made the F-1010B spacer.  Inserted the F-1032L/R longerons into the notches of the frames and bulkheads.  Although crude, Van’s method for bending the longerons worked quite well:


Centered the F-1010B spacer on the F-1010A horizontal stabilizer attachment angle:



Clecoed the F-1014 aft deck and F-1010B doubler to the F-1011 bulkhead and the F-1012A&B bulkheads:

No comments:

Post a Comment