10 MAY 14: Page
10-2 steps 2-6, page 10-3 steps 1-5: 5.5 hours
Deburred the F-1012A&B fuselage bulkheads, clecoed
together, and matchdrilled the 3/32 holes of the bulkhead and the tie down bar:
Made the F-1011E ruder cable angle, match-drilled the
nutplate rivet holes into the F-1011E , machine countersunk the rivet holes in
the angle:
Straightened the two F-1011C horizontal stabilizer
attachment bars:
Final drilled holes in common to the attachment bars and
bulkhead, match-drilled the holes of the bulkhead and the F-1011A bulkhead
stiffener, match-drilled the holes of the bulkhead and the F-1011E rudder cable
angle:
11 MAY 14: Page
10-4 steps 1-5, page 10-5 steps 1-4: 8 hours
Made the F-1010A horizontal stabilizer attachment angle. Separated the F-1010C bulkhead doublers into
left and right parts. Deburred the
F-1010 bulkhead and cleacoed the F-1010C-L/R bulkhead doublers. Match-drilled the holes in the bulkhead and
the bulkhead doublers into the F-1010A angle.
Final-drilled the remaining holes common between the F-1010 bulkhead and
the F-1010C-L/R doublers:
Deburred and final-drilled the F-1008, F-1007, and F1006
frames:
Spent the rest of the session finishing all the F-1047
fuselage stiffeners – 12 in all:
Between all the stiffeners and all the bulkhead parts, it
was a boring, but productive day. Not too many pics, just a bunch of parts:
No comments:
Post a Comment