4 NOV 15: Page 39-3 step 1, 39-4 step 2, redo baggage
frame: 3 hours
Cut the elevator forward and mid pushrods. Drilled holes for baggage compartment
lights. I’m installing two LED lights
and a small switch:
Redid the baggage frame. Redrilled and ready to prime:
6 NOV 15: Page 35-2 steps 3-5, Prekote, Prime: 9 hours
Dimpled passenger floor pans. MANY thanks to friend and fellow RV-10
builder, Mike Jimenez, who recommended only installing the pesky floor pans
once – not in and out, due to them being very difficult to insert/remove. I also enlarged the forward openings slightly
based on his recommendation. Used a
couple pieces of scrap .020 to cover the belt anchors – made the installation a
snap:
Spent the rest of the work session priming my final
pieces remaining. The only metal
remaining are the wing fairings.
Everything else is primed and ready to go!
7 NOV 15: Page 11-8 step 8, 11-9 steps 1-5, page 35-2 step 5
(right), 35-3 1(right): 7.25 hours
Riveted together the trim mount bracket
assembly. Installed the elevator trim
cables:
Finished riveting the right passenger floor pan in
place. Pretty awesome to be sitting
inside the plane!Riveting the aft flange of the floor pan:
Riveted the F-1024-R seat pan into place. Right side pax seat and floor all installed:
Ordered some rubber grommets from aircraft spruce. They were a perfect fit for the bulkhead holes and the inner diameter was the perfect size for the conduit: