9 AUG 15: Prekote and priming: 6.75 hours
Finished Prekote and priming fuse parts – no pics.
10/11/12 AUG 15: Page 29-15 steps 1-3, page 29-19 step 7: 6
hours
Dimpled fuse parts, riveted vents:
13 AUG 15: Page 9-15 steps 4-6 L, 31-2 1-5, 31-3 1-3, 31-4 1-4:
7 hours
Not sure why I waited to roll the elevator leading
edges, but I did, so a blast from the past:
Interestingly, it was neat to see the date I was
last on this step!So, looking over the elevator – which I haven’t looked at in a long time – I’m really glad I did the trim tabs multiple times! They turned out nicely:
Sub-panel assembly clecoed together:
14 AUG 15: Page 9-15 steps 4-6 R, 31-4 4, 31-5 1-2, 31-6 3-4: 5
hours
Rolled the right elevator leading edge, continued to
construct sub-panel assembly – no pics.
15 AUG 15: Deburred sub-panel assembly and top skin, cut holes
in top skins: 6.25 hours
Deburred all the sub-panel parts. Cut 2 holes in the top skin for the computer
fans I purchased. The fans will serve to
remove heat from the avionics bay and also serve as windshield defog if
needed. Pilot holes:
Looks pretty good:Holes all finished:
16 AUG 15: Prekote and prime: 5.25 hours
Got the swatches from Aerosport:
The boss has spoken and it looks like graphite
carpet and medium light stone leather:Hopefully, I can hit the paint shop this week and get some interior paint matched so I can continue progress on putting the fuse together. Until, then more Prekoting and priming – uggghhhh. I can say that I will NOT be upset when the priming is done.
Another batch done. Not too many pieces left to prime!