Saturday, August 9, 2014

Oshkosh 2014:
It has been forever since I flew at night, so the first order of business was to get night current – even though it has been about 6 months since flying a passenger at night:
Great place to be to enjoy the sunrise:
Clouds began to build as I neared the TN mountains – beautiful sight against the rising sunlight:
Beginning to cross the hills of Tennessee.  I would say mountains, but anyone from the west reading this would probably laugh.  At about 5,000 feet, and coming from an area with an elevation of 50 feet, they are mountains to me…
Pretty easy to see why they are called the Smokey Mountains:
Cloudier than I was expecting for early morning, but they dissipated once away from the hills:
Fuel stop – KHNB – Huntingburg, Indiana.  Cheap fuel - $5.12:
I remember passing these wind farms last year.  Not sure why it surprised me – just not expected to see this in this part of the country:
These towns always remind me of the computer game where you build a city.  They are in the middle of nowhere and are so self-contained.   They almost look fake – like a movie set:
I installed the Dynon ADS-B unit since last year’s Oshkosh trip.  It’s great to have on-board weather without the monthly XM fee.  I’d been watching this my entire flight north.  None of the weather was moving very fast.  I was worried I was going to have to land and wait this out as it was parked over KOSH, but by the time I got in the vicinity it had moved enough to skirt by:
The ADS-B traffic is a great addition, too.  Makes you realize how difficult planes are to spot and how much you miss with the old eyeballs! This is SW of Chicago's class B:
Approaching KOSH from Fisk.  As planned I was early, so it was just like a normal arrival – almost – except for the close in left downwind and early base turn:
Arrived safely again this year.  On the taxi to Homebuilt Camping:
The early bird gets the worm – and choice of camping spots.  Straight ahead you can see Jerry Fisher’s truck.  He is a volunteer from Georgia.  Great guy and a vet.  He runs the homebuilt camping area – and is just a heck of a nice guy to boot!  Also seen is the blue and white tent where we gather for coffee every morning.  The show is nice, but every year my favorite part is hanging in the tent every morning, meeting and getting to know all the people.  This year’s notables were John – a dentist from Arkansas, and former Marine, and Carl from Texas who works at NASA.  Every morning we solved all the country’s political problems over a few cups of java:
First stop was to the Target just outside of the airfield gate to pick up some groceries for the week.  On the way there, I stopped by Friar Tucks to get a sandwich – I hadn't eaten all day.  This is actually a fish sandwich – one huge piece of fish, for sure:
Back at the camp site, I set up my tent and unpacked the plane:
Home sweet home for the next week:
Had to snap a pic of the Airventure sign:
Then it was off to the flight line to watch the arrivals.  This is a fun part of coming early.  You get to watch during the busy arrival periods.  It’s amazing how many aircraft they land one after the other.  You get some great pics:


This woman didn't seem to be quite as interested in the activities.  Apologies if you ever stumble across the blog – one in a million chance, but apologies all the same:
The next morning looked to have a bit more sunshine:
First order of business was to get my free hat from Jeppesen.  Each year they give a free hat if you order your tickets online and bring them your printed ticket.  Amazing how many folks, myself included, will stand in line for a free hat!
Standing room only at one of the workshops.  I believe this one was on composite (fiberglass) finishing:
At some point I  headed over to an area where all the RV-10s park to look at the various planes.  It’s amazing how differently I look at the planes this year now that I’m building.  As luck would have it I happened across Geoff Combs from Aerosport Products.  Geoff makes interiors (among other items) for RV-10s.  His interiors definitely highlight a great plane and, in my opinion, give it the finishing touch it deserves.  Not too inexpensive, but when the time comes, I will definitely finish my interior with his products:

Over the course of the week, I had to stop by the Cirrus tent.  I wanted to get ideas for paint schemes.  I always like Cirrus paint – pretty simple, but really nice in my opinion.  Their aircraft are absolutely gorgeous.  If only I had an extra 750k lying around.  The -10, however, will have remarkably similar capabilities – crazy to think about that.  Gorgeous scheme.  That’s red BTW.  A bit overexposed and looks like orange:
Check out the beautiful leather:
It’s amazing to look at this panel, which looked so advanced only a few years ago, and to think how common it is to outfit homebuilt planes with the same capability:
In fact, the autopilot controller (in the lower center console with the blue button) looks identical to the Garmin non-certified unit that I will most likely put in the -10 when the time comes:
Mmmm – looks familiar.  Garmin’s non-certified, experimental version at a fraction of the certified cost:
I really like how Cirrus does the breaker panel – keeps the instrument panel clean.  I will definitely put this in the good idea file for when I start thinking about wiring the plane.  A lot of guys are going to the digital breakers – the VP-X system – but I’m not sold on it.  More than likely I’ll stick with the traditional circuit breakers and I really like the idea of putting it in this location – the side of the center console by the pilot’s foot well.  ELT switch down there, too:
Hanging out by the tent one evening, the lighting was perfect for photos.  Unfortunately, I really didn’t have much to photograph.  Love the lighting!
Some of the folks I met this year. Finishing the night at SOS.  Meeting great folks is what makes Oshkosh awesome:
Getting a pic with SOS’s giant sign – they bring it down at closing time:
Unfortunately, getting back after midnight, most of the gates to the airfield are closed.  Everyone else in the group crawled under the fence, I chose to go over - they said it was because I was 'the Army guy'.  Actually, it was because I didn't want to get stuck like this guy - it was a pretty tight squeeze to go under!  Hilarious!
My plan was to take off around 1000 Thursday morning.  Unfortunately, there was an aircraft accident at about 0930 that shut down the field.  This created a huge back log of aircraft.  It took forever just to get an escort to taxi out of homebuilt camping.  Once, out, I didn’t get to taxi very long – just up to the taxiway to get in line and shut down with the others:
Once we got rolling, it was slow going – lines of planes both coming and going.  Probably took :30-:45 to get to the departure end of runway 36:
Wanted to get out earlier so I didn’t have to dodge all the cumulus build ups:
Mmmmm – will shooting that hole maintain cloud clearance?
Interesting site to fly over.  Wonder if there’s any gold in there anymore..?
Started to get hazy once I hit the Smokies:
Once over the Smokies and closer to Atlanta, thinks started to get worse:
Eventually I was on top of a scattered layer.  Never really became a broken layer fortunately, but it was close:
I love having weather in the cockpit.  Just like the way up, weather was parked over my destination.  Not a whole lot of cells in the area, except this one RIGHT over home.  They weren’t moving either.  I watched them parked over home for a good 1 – 1.5 hours:
Fortunately the weather moved to the west in time for my arrival home – another Oshkosh in the books.  I’m already looking forward to next year!

Sunday, August 3, 2014

It’s been quite a while since I posted an update.  I spent the last week at Oshkosh Airventure, so not a lot of progress has been made on the wings.  But, as usual, Oshkosh was awesome, so it was well worth it.  I’ll post a separate Oshkosh trip report.

21 JUL 14: Page 13-2 steps 8: 2 hours
Finished match drilling the W-1028A wing box j-stiffeners and W-1028 wing box j-stiffeners to the flanges of the spar assemblies – no pics.
22 JUL 14: Page 13-3 step 1: 2.75 hours
Drilled #40 through all the 3/32 holes in the flanges of the spar assemblies – no pics.
23-24 JUL 14: Page 13-3 steps 2-3: 3 hours
Countersunk the nut plate attach rivet holes in the flanges of the spar assemblies.  Machine countersunk the skin and rib attach rivet holes in the flanges of the spar assemblies - no pics.
02 AUG 14: Page 13-3 steps 4-5: 6.5 hours
Riveted the fuel tank skin attach nut plates to the spar assemblies:
Outside of the flange:


Machine countersunk the fuel tank attach screw holes.  This process is taking quite a long time – the countersinks are quite deep, so I have to sneak up on the hole, incrementally increasing the counter sink size.  I probably had to go over each hole 5 or 6 times until the final size was reached.  Trying to go too deep at once, causes the countersink to wobble and create an oblong hole.
03 AUG 14: Page 13-3 steps 5-9: 6.5 hours
Continued to machine countersink the fuel tank attach screw holes.  So many holes!
A pretty tedious process, but taking my time resulted in pretty nice countersinks:

Riveted the wing access plate attach nut plates to the spar assemblies:
Finally for the session, primed the areas where the anodize finish was removed during countersinking:

Saturday, July 19, 2014

09 JUL 14: Wing Kit Arrives!!!
I haven’t posted in a while, but the wing kit arrived!
I probably won’t get much done the rest of this month.  I’m finishing odds and ends with some of the empennage pieces, plus I’ve been messing with the RV-7A getting ready for Oshkosh!!  I can’t wait to go.  Last year was my first year and it was awesome!!  I’m leaving Friday the 25th and staying until the following Friday.  Like last year, I’ll be camping in the Homebuilt Camping Area – mostly all other RVers.  Hope to have a good blog post when I return.  I’ve had a pretty good build pace – been averaging 80ish hours/month.  July will be much lower, but it is worth it for a week of decompression at Oshkosh.
12 JUL 14: Page 10-23 step 2: 2 hours
My friend Larry came over this morning and helped me finish up the tail cone riveting.  Larry is a local RV-10 builder.  He is a few years ahead of me.  It’s great to have his knowledge and experience to lean on as I progress through this journey.  No pics.
14 JUL 14: Page 13-2 steps 1-2: 2.5 hours
Clecoed the W-1006E-L main spar web extension to the W-SPAR ASSY-L spar assembly using four W-1006F spar splice plates.  Final drilled the spar splice plates to the spar assembly and web extension using a #30 drill:
Marked the splice plates so as to note their orientation:
15 JUL 14: Page 9-16 step 3: 1.25 hours
Decided to redo my elevator trim tabs – one is good, the other not so good.  I’m going to redo both to see how they turn out.  Marked the inside for pro-sealing the foam ribs and final drilled the holes – no pics.
17 JUL 14: Page 9-16 step 3: 1.25 hours
Deburred all the holes and edges of the elevator trim tabs – no pics.
18 JUL 14: Page 13-2 step 3: 1.25 hours
Deburred and primed the W-1006F spar splice plates and the W-1006E-L/R main spar web extensions – no pics.
19 JUL 14: Page 10-23 steps 3-5: 1.75 hours
Attached the F-635 elevator bellcrank to the two F-1037A bellcrank angles.  Bolted the two F-1037A bellcrank angles to the F-1035 battery/bellcrank mount:

Attached the F-1035 battery/bellcrank mount to the F-1037B & C bellcrank rib angles:

Saturday, July 5, 2014

30 JUN 14: Page 10-21 steps 1-3: 5.8 hours
Riveted the nutplates to the bellcrank rib angles:

Riveted the bellcrank rib angles to the bellcrank ribs:

 Finished the evening by dimpling the F-1075 aft top skin:
04 JUL 14: Page 10-23 steps 2, page 10-21 steps 4-5, page 10-22 steps 2-3: 7.5 hours
Back riveted the j-channels to the F-1075 aft top skin.  Accidentally riveted two holes that were supposed to be left open to accept a nut plate for the empennage fairing.  I already had the skin (with j-channels riveted) attached to the tailcone and didn’t want to take it all apart.  I carefully drilled off the heads, then drilled through the entire rivet.  This has to be done with extreme care, and a very small bit, to stay in the rivet and not drill into the hole.  If done correctly, this is the result:

Then, using a punch, it is very easy to remove the shop head by hand and not affect the thin metal of the j-channel – as opposed to trying to hammer it out:

Spent the rest of the session riveting the aft part of the tail cone / aft deck.  I was able to squeeze a lot of the rivets, but had to buck a few as well.  All in all it went fairly smoothly – no rivets to drill out:
05 JUL 14: Finished up tail cone: 1.75 hours

Finished up what could be done solo on the tail cone.  The rest will require a partner to help buck.  Next weekend a fellow RV-10 builder will stop by and help me finish up the riveting.  My wings are due on Wednesday, so this is pretty good timing.  With the tail pretty much done, it was time to clean and organize the shop to make room for the wings!