30 JUN 15: Page 28-17 steps 1-2: 3.75 hours
Installed the WD-1021-R landing gear mount. Went a bit quicker the second time. I realized in doing the right mount, that I
had not mounted the left side correctly when I match drilled the forward mount
plate. What this meant was that when
mounted correctly the forward mount plate would be drawn aft another ¼” and the
holes would not line up with the nutplates.
A quick trip to a local welder had the holes filled in for a second try –
no pics.
1, 2, 3, 6 JUL 15: Page 29-2 steps 1-7, page 29-3 steps 1-4: 10.5
hours
Beginning the infamous section 29! First up is twisting the longerons. Cutting the longerons to size:
The 113” forward fuse longeron – this one took quite a while to get just right. Matches the template almost exactly:
8 JUL 15: Test fit longerons: 1.5 hours
I took a pause to test fit the longerons. I wanted to make sure the bends were good and
that the rivet lines lined up with the skins.
All lined up pretty nicely!
9 JUL 15: Page 29-4 step 2: 1.25 hours
Fabricated the F-1070A/B roll construction angles –
no pics.
11 JUL 15: Page 29-4 step 3, page 29-6 steps 1-6, page 29-7 steps
1-2: 4 hours
Match-drilled #40 the holes in the roll construction
angles. Cut and match-drilled the
baggage door seal angles. Match-drilled
the holes common to the seal angles, mid-fuse longeron, seat back brace, and
brace gusset:
Final drilled #19 the screw holes in the lower flange of the F-1015C-L/R mid cabin decks. Machine countersinking the holes for #8 screws: