17 NOV 14: Page
16-3 step 3 Left Wing: 1.75 hours
Continued to rivet rear spar of left wing. Riveted my patch for my figure eighted hole –
came out nice, all things considered:
18 NOV 14: Page
16-3 step 3, page 16-4 step 4 Left Wing: 4.2 hours
Finished riveting the left wing rear spar:
Riveted the outboard hinge bracket assembly to the wing
assembly:
19 NOV 14: Page
16-3 step 3, page 16-4 step 4 Right Wing, page 18-2 step 4: 2.5 hours
Finished riveting the right wing rear spar. Riveted the
outboard hinge bracket assembly to the wing assembly. Both wing top skins are complete:
Trimmed the T-1011 tank stiffeners and T-1008 vent line
clips:
Trimmed the T-1012 tank attach Z brackets:
21 NOV 14: Page
18-2 steps 3-4: 3.25 hours
Finished cutting and deburring the T-1011 tank stiffeners,
T-1008 vent line clips, T-1012 tank attach Z brackets, and T-1009 tank
j-stiffeners:
Once again, friend and RV-14 builder Mike Hammond came over
and we riveted both leading edges to the main spar assemblies. Again, riveting goes super-fast with two people
doing the job. Both wing leading edges done:
Time to build the wing stand to get the work benches free
for future work. I decided to use this
one that I found again and again online:A couple hours later and the stand is complete. It turned out pretty nice and it is nice to be able to easily move the wings around the shop:
No comments:
Post a Comment